How to Test Disaster Recovery Without Stopping Production

How to Test Disaster Recovery Without Stopping Production

A backup that has never been restored is an assumption, not a recovery plan. When an ERP server fails at 6am, or ransomware locks the files needed to release a job to the shop floor, the question is not whether data was backed up. It is whether you can test disaster recovery and restore the right systems, in the right order, quickly enough to keep commitments to customers.

For manufacturing and engineering businesses, recovery is rarely as simple as getting email working again. It may involve ERP or MRP, CAD files, licence servers, warehouse terminals, shared production documents, machinery-connected PCs and internet connections used by suppliers. A sensible test gives management evidence that these dependencies are understood and that an outage will not become an open-ended production problem.

What a disaster recovery test should prove

A disaster recovery test is a controlled exercise that confirms your people, systems, backups and suppliers can recover after a serious disruption. It should answer three commercial questions: what can be restored, how long will it take, and what data or transactions might be lost?

Those answers are usually expressed through two targets. Recovery Time Objective, or RTO, is the maximum acceptable time before a system must be available again. Recovery Point Objective, or RPO, is the maximum acceptable amount of lost data, measured from the last usable backup or replication point.

Neither figure should be chosen by IT alone. If losing four hours of stock movements means the warehouse team must reconstruct hundreds of transactions, a four-hour RPO is unlikely to be acceptable. Equally, a 15-minute target for an old production application may require investment that is disproportionate to its actual operational value. The right target depends on the consequences of delay, not on a setting in a backup console.

A good test also proves more than technical recovery. It checks whether staff know who authorises decisions, who contacts a software supplier, how production is prioritised, and how the business communicates when normal systems are unavailable. Technology can be restored perfectly while the response still drifts because nobody owns the next decision.

Map the systems that keep production moving

Before running a test, create a short recovery map. This is not a lengthy document written for a filing cabinet. It is a practical view of what must come back first for the business to operate.

Start with the process, not the server list. For example, an engineering firm may need its firewall and internet connection, identity services, ERP database, application server, file storage, label-printing service and warehouse Wi-Fi before it can receive goods, issue materials and despatch finished work. CAD may be less urgent for despatch but essential for the design team to release revised drawings.

Include systems that are easily missed: licence servers, shared folders, virtual machine hosts, network switches, multi-factor authentication, cloud applications, scanned quality records and phone numbers for key suppliers. Ask the production manager, warehouse lead, finance team and internal IT contact what stops them working, rather than relying solely on an asset register.

Pay particular attention to machinery-connected computers and legacy equipment. A Windows PC attached to a CNC machine may not be suitable for a routine rebuild or operating system upgrade. Its recovery plan may instead require a known-good disk image, spare hardware, documented configuration and a segregated network. The aim is not to pretend that old equipment has modern security characteristics. It is to reduce the chance that its failure or compromise stops the wider business.

How to test disaster recovery in stages

You do not need to simulate a full site outage on the busiest day of the month. In fact, starting with an all-or-nothing exercise often creates unnecessary risk and discourages the next test. Build confidence in stages and increase the scope as your documentation and controls improve.

1. Review backup success and coverage

First, check that every critical system is actually included in backup, with retention that matches business and contractual needs. A green backup report can still conceal a problem if it only confirms that a job ran, not that the data was complete or recoverable.

Confirm where backups are held, whether at least one copy is protected from alteration by ransomware, and who can access or delete them. Review Microsoft 365 separately. Files in SharePoint, emails in Exchange Online and Teams data may have retention features, but these are not automatically a complete independent recovery strategy.

2. Restore individual files and data

Restore a sample of drawings, quotations, spreadsheets, quality records and ERP exports to a separate location. Ask the people who use them to open the files and confirm that they are current, readable and complete.

This is a low-disruption test, but it matters. A file can restore successfully and still be useless if permissions are wrong, the file is corrupted, or the application version needed to open it is unavailable.

3. Recover a critical application in isolation

Next, restore a copy of a critical server or application into an isolated test environment. Do not connect it to the live production network without planning. The test should confirm that the operating system starts, the database is consistent, users can sign in, and the application performs the functions required to resume work.

For an ERP or MRP system, test a realistic workflow. Can an authorised user locate an order, check stock, issue a works order and produce the documents needed on the factory floor? For CAD, can a designer access current project files and open them with the required software and licences? A login screen is not proof of operational recovery.

4. Rehearse the wider recovery sequence

Once individual restores are reliable, run a planned scenario with the relevant teams. A useful hypothetical example is the loss of the main virtual server host after a power issue. Work through the documented order of recovery, record timings, and identify decisions that caused delays.

This exercise should include external parties where needed. Your ERP provider may need to validate the database. A connectivity provider may need to confirm failover arrangements. A specialist machine supplier may own configuration details for shop-floor equipment. Testing exposes gaps in responsibility while there is time to resolve them, rather than during a live incident when every supplier is certain the issue belongs to someone else.

5. Test communications and manual workarounds

Recovery takes time, even with well-managed systems. Test the process staff will use during that gap. Can production record work completed without access to ERP? Can the warehouse identify priority despatches? Where are customer contact details if email is unavailable? Who can approve overtime, alternative suppliers or a temporary change in process?

Manual workarounds should be limited, controlled and reconciled once systems return. They are a bridge, not a substitute for recovery. A clipboard may be dependable, but reconciling three days of handwritten stock movements is not a sensible long-term resilience strategy.

Make the test realistic without creating disruption

The safest approach is normally a planned out-of-hours or low-production test, with clear success criteria and a rollback plan. Tell affected people what will happen, what is not being changed, and who has authority to stop the exercise.

Avoid testing only the easy parts. Restoring a non-critical folder proves little about a ransomware incident or failed server host. At the same time, do not attempt to fail over live systems merely to produce a tick in a report if your environment has not been designed for it. A controlled restore to isolated infrastructure may provide better evidence with less operational risk.

Record the actual recovery time, not the expected time. Note missing passwords, unclear supplier contacts, absent licences, failed scripts, unexpected dependencies and decisions that needed escalation. These findings are the value of the test. A test that reveals problems has done its job; a report that quietly removes them has not.

Common gaps in manufacturing recovery plans

Many businesses discover that backups exist but the recovery plan is incomplete. The following issues regularly deserve attention:

  • ERP databases are backed up, but the application, reporting tools or licence service are not.
  • Critical drawings are stored on personal devices or shared drives without clear ownership.
  • Old machine PCs have no documented build, spare device or recoverable image.
  • Network diagrams do not show which switches, Wi-Fi points and firewall rules support warehouse or factory operations.
  • Supplier remote access remains available but is not documented, reviewed or included in incident procedures.
  • Backup access uses the same administrator credentials that could be compromised in a ransomware attack.

None of these issues automatically means a business is unprepared. They do mean the plan needs specific treatment. Some systems can be replaced, some need specialist support, and some should be isolated so that their failure does not spread into the rest of the network.

Set a sensible testing schedule

The right frequency depends on how often systems, data and suppliers change. As a practical baseline, review backup reports routinely, test file restores regularly, and carry out a documented recovery exercise for critical services at least annually. Test again after major changes such as an ERP upgrade, cloud migration, new production equipment, a change of backup platform or a significant supplier change.

Customer security questionnaires, cyber insurance renewals and Cyber Essentials preparation may also ask for evidence of backup and recovery arrangements. A dated test record, defined recovery objectives and documented improvements are far more useful than a verbal assurance that backups are monitored.

For manufacturers across Hampshire, Surrey and West Sussex, the most valuable outcome is certainty: knowing which services can be recovered, who is responsible and how production will be protected while recovery is under way. If you are unsure whether your backups would restore the systems that run your operation, Syn-Star can help review the recovery sequence and plan a controlled test before an incident chooses the date for you.